Skip to content
Hiring Guide

The True Cost Of Offshore Developers

A rate card shows one number. Your budget has to cover several more. This guide lists each cost component, explains what drives it and shows what you can do to control it.

The Rate Is One Line In The Budget

Most comparisons of offshore hiring start and stop at the rate. That is understandable, because the rate is the only figure that appears on a quote. It is also the reason budgets are missed.

An offshore developer needs direction, tools, access and a working relationship with your team. Each of those takes time or money. None is unique to offshore hiring, but distance and time zones can make some of them larger.

This does not make offshore hiring a poor choice. It means the comparison should be made on total cost. When the other components are planned for, the result is predictable. When they are ignored, the saving on the rate can be lost elsewhere.

Cost Components And Their Drivers

The final column shows what each component costs with SyntecHire. Components paid in your own time are marked as such.

Cost componentWhat drives itHow to control itSyntecHire figure
Developer rateSeniority, stack, location and demand for the skillHire the level the work needsQuoted in writing
Management timeClarity of requirements, team size and experience of your leadWritten specifications and a named owner for prioritiesYour time
Tooling and licencesSeats for source control, build systems, environments and communication toolsReview seats and access when the team changesQuoted in writing
OnboardingState of your documentation, setup complexity and access approvalsSetup scripts and an up-to-date guide to the codebaseYour time
Overlap hoursTime-zone gap and the number of live meetings you requireAgree a fixed overlap window and use written updatesQuoted in writing
TurnoverEngagement length, quality of the work and how the engineer is treatedInclude remote engineers in planning and give feedback earlyYour time to re-onboard
ReplacementSearch, interviews, handover and lost contextKeep decisions and setup documented in your own systemsQuoted in writing
ReworkUnclear requirements and late reviewSmall changes reviewed oftenYour time

SyntecHire replaces a developer if the fit is wrong. You interview the replacement before they start.

Each Component In Detail

  • Management time

    Someone on your side sets priorities, answers questions and reviews work. The less that is written down, the more of this time you spend.

    • Grows with team size
    • Shrinks with clear written requirements
  • Tooling

    Each engineer needs access to your repository, build pipeline, environments and communication tools. Many of these are priced per seat.

    • Count seats before you hire
    • Remove access when people leave
  • Turnover

    When an engineer leaves, their knowledge of your system leaves too. The cost is the time it takes a new person to reach the same level.

    • Lower in long engagements
    • Reduced by good documentation
  • Overlap hours

    Live conversation needs shared working hours. A large time-zone gap leaves fewer of them. Questions asked outside the overlap wait until the next day.

    • Agree the overlap window up front
    • Use written updates for the rest
  • Replacement

    Replacing an engineer means a new search, new interviews and a handover. The provider may cover the search. The handover still takes your team's time.

    • Ask what the provider covers
    • Ask who pays during the handover
  • Communication

    Written communication takes more care than a conversation at a desk. Teams that already write things down adapt quickly. Others need to build the habit.

    • Decisions recorded in writing
    • One channel for questions

What Raises And Lowers Total Cost

Raises total cost

  • Requirements explained only in calls
  • No named person to answer questions
  • Large pieces of work reviewed at the end
  • A series of short engagements on the same codebase
  • Setup that depends on one person's memory

Lowers total cost

  • Requirements and decisions in writing
  • One owner for priorities
  • Small changes reviewed often
  • The same engineers over a long period
  • Documented setup in your own repository

Most of these are within your control and apply to local hires as well.

Questions To Ask Any Provider

Ask us the same questions.

  • What does the rate include?

    Ask about equipment, leave, software and any fee that sits on top of the rate.

  • What are the contract terms?

    Ask about the minimum term, the notice period and any charge for leaving.

  • What happens if the fit is wrong?

    Ask who finds the replacement, who pays during handover and whether you interview them.

  • Who owns the work?

    Ask when IP is assigned, whether an NDA comes before code access and where the code is stored.

Validate Your Budget

Use the cost estimate to build a total for your team, then add your own figures for management time and tooling.

Frequently Asked Questions

Have More Questions?

It depends on seniority, stack and location. Use the cost estimate for a figure based on your role and team size, and add the components on this page to reach a total.

It differs between teams. Management time and turnover are the two that are most often left out of a budget. Both depend heavily on how well requirements and decisions are documented.

If the fit is wrong, we replace the developer. You interview the replacement before they start. Engagements run month to month with no exit fee.

No. It is often cheaper on the rate. Whether it is cheaper in total depends on the components on this page and how well they are managed. Compare total cost for your own situation.